If you are constructing a building or planning to construct one you might be thinking of ways you can employ to secure your building from termites. I am talking about pre-construction Termite Treatment which can be done to prevent termite damage even before it happens. This type of treatment is usually carried out on the structure of the construction in the early phase. This is the most effective way to prevent termite infestation.
Buildings are one of the most valuable possessions people have. Your building is a lifetime investment, a lot of time and money goes into the construction of these edifices. It is no surprise that homeowners would want to tackle anything that wants to get in the way of them enjoying their building to the fullest. Termites are one of those things, it is not for nothing that they are called the most invasive pest in the world.
Table of Contents
What is Pre-Construction Termite Treatment
Pre-Construction Termite Treatment is Termite Treatment usually performed before the building is completed. It involves the treatment of the soil beneath, building pillars, and other joints with Termite Treatment chemicals. This treatment will prevent termites from infesting the building in the future.
Pre-construction Termite Treatment in Noida is a chemical barrier placed between the soil beneath and the brickwork foundation. This is done to keep termites away from the building.
Pre-construction Termite Treatment should be done up to the plinth level of the substructure. The procedure includes soil treatment with chemicals in water emulsion in the foundation. This treatment is also carried out in plinth filling, plinth beams, wall-floor joints, expansion joints, and other phases.
When To Apply Pre-Construction Termite Treatment On The Soil
New construction termite treatment soil treatment procedures should start when foundation pits and trenches are ready. After chemical application, the chemical emulsion should be absorbed by the soil till the surface is dried. After that concrete should be laid. In case of rain or if the soil is wet either as a result of rain or subsoil water, the treatment should not be done on such soil. In the treatment of the filled earth surface in the plinth area before the installation of the floor subgrade, the same caution also applies. The treated soil should be distributed. If the barrier is disrupted accidentally it must be restored so the barrier system can be completed.
Procedure For Pre-Construction Anti-Termite Treatment
The chemicals for the treatment should be injected in order three times into the ground.
The Soil Should Be Prepared
The surface should be drilled 300mm deep and 12mm in diameter at 150mm intervals below the PPC. The chemicals should be applied at 5 liters per square meter.
Treat the Building’s Substructure
The substructure of the building surrounded by earth should be treated with chemicals at 7.5 liters per square meter. The chemicals should be injected 150mm away from the substructure and 450mm deep at this point.
Backfill The Inner Plinth Wall
Before installing flooring, the inner plinth wall should be backfilled using good soil. The chemical treatment should be done at 5 liters per sqm rate.
Chemical Composition
Chemical composition for pre-construction Termite Treatment is: Chloro-physios 20% EC @ 1 percent concentration in aqueous emulsion.
Imidacloprid 30.50% SC @ 0.075 %.
What Does A Chemical Barrier Mean In Per Construction Anti-Termite Treatment?
A chemical barrier is the treated soil that comes in contact with the foundation of the building and floor structure. This barrier repels and kills Termites thereby making a termite-proof barrier.
What is Soil Treatment?
In pre-construction termite treatment, soil treatment is the procedure that involves the application of anti-termite chemicals to the soil beneath or next to a structure. This is part of the process of creating a chemical barrier that repels or kills termites. With this method, the building is treated using chemicals in the early stages.

Anti-Termite Treatment for RCC Foundation
To treat reinforced cement concrete the RCC foundations must be 500mm deep below the ground. Except there is an increase or decrease in the ground level after casting the foundation by cutting or filling.
The depth of 500mm should be calculated with the new soil level that the cutting and filling created. The same goes for the soil that is in contact with the RCC surface. Foundation treatment should be at the rate of 7.5 liters per square meter.
Treatment For Foundation Trenches For Masonry Wall And Basement
The chemicals should be injected into the bottom of the foundation, surface, and sides to a height of 300 mm for masonry foundations. For the basement, the rate should be 5 liters per square meter of surface area.
Vertical Backfilled Soil Along Masonry Foundations Anti Termite Treatment
Backfills that connect with the structure of the foundation should be treated at a 7.5 liter per square meter. This should be done per square meter of the vertical surface of the sub-structure for all sides of the foundation. Also, the basement retaining wall and the masonry foundations must have been constructed first. The filling for the soil should be done in layers, just as the treatment follows a step-by-step process. For the ground to be adequately treated the chemical must be injected into the surfaces of the masonry.
Anti-Termite Treatment of Plinth Filling Tip Surface
Before placing the subgrade and sand bed, the top surface of the earth inside the plinth wall should be treated using chemical emulsion at a rate of 5 liters per square meter. The same treatment also should be done for DPC on the plinth wall.
Junction of Wall and Floor Anti Termite Treatment
Use a short channel to carry out this treatment at the wall junction. The rod holes are 150mm apart and channeled up to the ground level. The iron rod should be used to create a hole in the earth by moving the rod backward and forward. The chemical emulsion should be poured at 7.5 liters per square meter rate of the vertical wall. The soil must be compacted well after anti-termite treatment is completed.
Treatment For Soil Surrounding Wastes Conduit And Pipes
External work like waste, pipes, and conduit are in contact with the soil in the foundation, the soil surrounding these installations should be loosened. This should be a depth of 75mm and a distance of 150mm before treatment commences.
Pre-construction Termite Treatment or pest control in Noida is a technical process, this is why it should be done by a professional. Keyvendors would provide you with an expert technician to carry out pre-construction termite treatment for your building.
Conclusion
A building is a great and lifelong investment. Without the proper termite control measures in place, your Investment can be in jeopardy from termites. The good news is Termite infestation can be prevented and the best way to do that is to embark on Termite Treatment at the earliest stages of construction. To find out the pre-construction termite treatment cost contact Keyvendors. At Keyvendors you can hire pre-construction termite control experts and protect your lifelong investment. These professionals will help you decide the best course of action to repeal or terminate termites.